References
CLIENT | COUNTRY | PROJECT | EQUIPMENT |
AGOCO | Libya | Unknown | Fuel Gas Pressure Reduction Package 2007, onshore |
British Gas c/o Flour | Offshore Trinidad | Pointsetta Project | Fuel Gas Treatment/Pressure Reduction Package 2007, fixed offshore platform |
SBM Offshore | USA | Thunderhawk Project | Glycol regeneration package, 60mmscfd, 1,960psig operating pressure 2007, floating production (spar) |
Khalda Petroleum / Petrofac | Egypt | Salem Gas Train | Glycol dehydration packages for sales gas trains 2007, On shore |
North Oil Company | Iraq | Khurmala Dome | Two electrostatic treaters and four crude heaters 2006, onshore |
North Oil Company | Iraq | Khurmala Dome | Design and supply of 100 MMSCFD Glycol Dehydration and Regeneration Unit 2006, onshore |
Pemex Exploration and Production | Mexico | Sinan C and D Platforms | Two 48” x 15’ x 1800 psig horizontal test separators |
Total / Fina / Elf | US GoM | Matterhorn TLP | Replacement grid package for 120” x 40’ electrostatic treater, 2005, floating production, TLP |
Pemex Exploration and Production | Mexico | Sinan A Platform | 48” x 15’ x 1800 psig horizontal test separator package 2005, Fixed offshore platform |
Pemex Exploration and Production | Mexico | Sinan A Platform | HP/LP fuel gas conditioning package 2005, Fixed offshore platform |
Pemex Exploration and Production | Mexico | Sinan B Platform | 48” x 15’ x 1800 psig horizontal test separator package 2005, Fixed offshore platform |
Pemex Exploration and Production | Mexico | Sinan B Platform | HP/LP fuel gas conditioning package2005, Fixed offshore platform |
Trinidad Exploration and Production | Onshore Trinidad | 26” x 10’ x 1440 psig horizontal test separator package 2005, onshore | |
El Paso Energy | Onshore USA | Two indirect line heaters, 1.5 MMBTU/HR each 2004 ohshore | |
Pearl Oil c/o Expro Indonesia | Indonesia | 120” x 40” x 150 psig electrostatic heater treater. Scope included design, supply of internals, transformers, and burners, 2005 fixed offshore platform | |
AGOCO | Libya | Sarir | Six slot manifold, 2005, onshore |
Newfield Exploration and Production | Offshore USA | 96” x 20’ x 150 psig horizontal water skimmer package 2005, fixed offshore platform | |
Shell Oil | Offshore USA | Auger Platform | 120’ x 30’ x 250 psig horizontal electrostatic bulk oil treater, 2006 floating production, TLP |
Xplor Energy | Offshore USA | Main Pass 35 | Repair and startup of glycol dehydration package 2005, fixed offshore platform |
Chevron | Offshore Angola | Design of 120” x 40’ x 500 psig vertical deareator vessel 2006, fixed offshore platform | |
W.G. Helis | Offshore USA | West Cameron Block 21 | Packages included 36” x 10’ x 1440 psig Test Separator, 48” x 10’ x 1440 psig production separator, 72” x 20’ x 125 psig water skimmer, 20 mmscfd glycol dehydration package 2004 fixed offshore platform |
British Gas c/o Worley Parsons Limited | Offshore Trinidad | Central Block facility | Fuel Gas Treatment/Pressure Reduction Package 2006, fixed offshore platform |
Shell Oil | McAllen Gas Plant | 250 MMSCFD pressurized reconcentrator, gas inlet saturated at 1000 psig and 115oF, outlet requirement 6 LBS/MM 1999, onshore | |
Bay Gas Storage | Onshore USA | 300 MMSCFD, Mobile, Alabama - Storage dome facility, gas inlet under saturated at 1000 psig and 120oF, outlet requirement 6 LBS/MMs , 1998 - onshore | |
Petrobras, | Project P-36 | Semi-submersible 250 MMSCFD gas inlet saturated at 2500 psig and 120oF, outlet requirement 3 LBS/MM 1997 – floating production, TLP | |
ExxonMobil | East Cameron | Block 286 | Glycol dehydration unit, 100 MMSCFD gas inlet saturated at 1100 psig and 120oF, outlet requirement 7 LBS/MM 1996, fixed offshore |
BP | USA GoM | Marlin facility | Glycol dehydration package, 300 MMSCFD TLP in Gulf of Mexico. Design to allow increasing capacity by 50% while eliminating operating problems 1999, Floating Production, TLP |
Chevron | Nigeria | Escravos | Glycol Dehydration unit, one 200 MMSCFD Unit and one 50 MM unit. Designs to increase capacities of both. 1998, inshore waters, fixed paltform |
Duke Energy | USA | Moss Bluff | Glycol dehydration unit One 1000 MMSCFD unit - complete new reconcentrator and replacement of bubble cap trays with structured packing to increase capacity and reduce glycol losses. 1998, onshore |
Newfield Exploration and Production | USA | Brazos 504B | 15 MMSCFD facility, tripod deck, jacket and piles 2004, fixed offshore |
Mariner Energy | West Cameron | 333 | 20 MMSCFD w/associated liquids facility, deck, jacket and piles 2004, fixed offshore |
Tana Exploration | USA | Brazos A2B | 10 MMSCFD facility, tripod deck jacket and piles, 2003 fixed offshore |
Saipem | Angola | West Espoir Field | Test Separator, Pig Launcher, and Vent Scrubber Packages, 2004, fixed offshore |
Occidental Petroleum | Ecuador | Two (2) 10’ x 50’ bulk oil separators, 2004, onshore | |
Dominion E & P | USA | Fabrication of 50/100 MMSCFD standard gas processing module, 2002, fixed offshore platform | |
Dominion E & P | USA | Refurbishment of 100 MMSCFD standard gas processing module, 2002, fixed offshore platform | |
McDermott / Spartec | USA | Design and Fabrication of major process equipment for the Front Runner, Devils Tower, and Medusa deep water spars, 2001 floating production, Spar | |
ExxonMobil | Nigeria | Yoho project | Design and fabrication of the process equipment for the phase A development project, 2002 fixed offshore platform |
Williams Energy | USA | Canyon Express | Designed and Constructed separation, water treatment, and oil treating packages 2002, fixed offshore platform |
ExxonMobil | Angola | Kizomba “A” | Fabrication of oil treating and seawater deairating equipment, 2003, FPSO |
Petrobras / Mannesman Demag | Brazil | Ubarana Project | Four-train gas turbo-compressor plant, process packages and interconnect piping, design, fabrication, hookup and commissioning 1997, onshore |
CMS Nomeco / Global Industries | Equatorial Guinea | Alba Field Development | Twelve oil and gas process packages, featuring Incoloy clad vessels, design, fabrication and pre-commissioning 1998 fixed offshore |
Murphy E & P | USA GoM | Eugene Island 335A | Oil production modules including separation and water treatment facilities for 1500 bopd and associated gas, design, fabrication and pre-commissioning 1998, fixed offshore |
Chevron / W & T Offshore | Main Pass 29 | Oil dehydration and treating facilities, design, fabrication, hookup and commissioning, 1998 fixed offshore platform | |
Coastal Oil and Gas | Vermilion 250H | Oil treatment package, design, fabrication and pre-commissioning, 1999 fixed offshore platform | |
Murphy E & P | USA GoM | South Timbalier 63A | Complete oil process facilities with nominal liquids and gas, design, fabrication and pre-commissioning, 1999,. Fixed offshore platform |